The business of construction is based on two major elements. The Design. And the Construction of the Design. Often companies shortlist the best of both and work simultaneously in different directions. Appointing the best in business contractors, that is, the best mind for design and the best hand for building it. Sounds like a relevant plan. However, what if the mind for design and the hands for the building of that design is of the same body.
1. Time Management
- Contractors appointed for the Design-Build delivery system have the ultimate advantage of cutting down the time involved.
- While working on the design controversies and clash of ideas can be avoided resulting in cutting down the time.
- Construction teams can plan before hand keeping in mind the possible alterations in the design.
2. Exchange of Reviews
- The design-build delivery system holds the two components intact creating an environment of counter review the work of each other.
- The review provides the key points that assist in the improvement of a design according to the construction limits.
- Also, thinking out of the box engineering ideas to meet the design requirements. Working together yields a high level of precision in each component.
3. Transformation from the Traditional Idea
- Performing the task of construction and design by different mediums is getting transformed into the Design- Build delivery system.
- It ensures that the company concentrates on a single contractor and analyse the work efficiently. When the focus point is unilateral, it results in high productivity.
4. Elimination Adversarial Action
- Working as a team enables the department compliment each other’s work. The traditional method involves the risk of rifts and clashes between design and building contractors over criticism of ideas of design.
- The risk can also be of building engineers for not following the design created.
5. Cost management
- Money is the deciding factor for the sustainability of a business. However, when the cost of construction goes out of the budget, it indicates failure.
- Dual mechanisms of design to build make all the difference when it comes to cost cutting. The system makes the estimated cost of the construction project known to the company before hand.
- When the company is well aware of the consequences and additional engineering outputs and the cost involved.
- The company can plan well in advance the finances. Whenever there is an escalation in the process the cost begins to rise.
- Working together the teams of design and marketing can frame cost cutting strategies. This improves the image of the company as being cost effective in terms of engineering.
- The company with design-build delivery makes the use of combined efforts from the designers and constructors to satisfy client needs at the lowest cost possible.
6. Decision
- The situations that arise during the construction of a building may call for quick decisions to be taken to resume the functioning. Such needs decide the timely delivery of the projects.
- A firm that handles both the elements can be much quicker with the decision. As the sole body has all the powers to form policies and regulate productivity.
- Conceptualizing the idea and working on the idea to furnish a feasible solution is the key element in the Design-build delivery process.
- Also designing the structures of also refers to the availability of required skill set to execute the job.
- The design department being well aware of the quality and efficiency that the other team can provide and takes immediate design solutions accordingly.